Joined
·
7 Posts
I use a 31 day cycle with several classes put in my "Stack". For example, I tend to ride the same 5+ rides on Dec 1st as I did on Nov 1st. Then a different set of 5+ rides on Dec 2nd as I did on the previous Nov 2nd.
This would be facilitated with the Overview screen showing at least 32 days, and preferrable 35 days (5 full weeks). The amount of screen space required would be the same.
Thanks for considering this.
This would be facilitated with the Overview screen showing at least 32 days, and preferrable 35 days (5 full weeks). The amount of screen space required would be the same.
Thanks for considering this.